4Richard de Neufville, Daniel King. Risk and need-for-work premiums in contractor bidding [ J ]. Journal of Construction Engineering and Management, 1991,117 (4) :659 - 673.
5Yeo K T, Ning J H. Integrating supply chain and critical chain concept in engineer-procure-construct ( EPC ) projects [ J ]. International Journal of Project Management,2002,20 (4) :253 - 262.
6Caddell Christopher P. A recommended total project cost riskmodel approach [A]. 53rd AACE International Annual Meeting [ C]. Seattle, WA, United States, 2009.
7Okmen Onder, Oztas Ahmet. Construction cost analysis under uncertainty with correlated cost risk analysis model [J]. Construction Management and Economics, 2010,28 (2) : 203 - 212.
8Zhong Denghua, Zhang Jianshe. A new method for calculating path float in PERT [ J]. -ournal of Construction Engineering and Management, ASCE, 2003, 129 (5), 501 - 506.