摘要
针对某电厂700MW机组MFT硬跳闸回路电源存在的问题,分析了规范要求和可能产生的不良后果,提出了两个解决方案,并对具体实施方案进行了介绍。
Aiming at the power supply problem in MFT hard trip circuit for 700 MW unit of a certain power plant,an analysis was conducted from the Specification requirements and the possible adverse consequences.Two solution plans were put found and the detailed implementation plan was also introduced.