摘要
为保证GIS设备的正常运行,就必须按照相关技术标准进行设备的安装和调试工作。介绍了GIS设备安装前的准备工作、安装过程中的相关技术要求和现场调试过程的质量控制。
In order to ensure the normal operation of GIS equipment,the installation and commissioning of equipment must be carried out in accordance with relevant technical standards.The paper introduced the preparation of GIS equipment before installation,the related technical requirements during installation and the quality control of on-site commissioning process.
作者
胡舫舸
HU Fangge(Hunan Electric Power Service Co.,Ltd.,Changsha 410000,China)
出处
《电工技术》
2018年第1期152-153,共2页
Electric Engineering