昌马水库电站节能改造方案实施

Implementation of energy conservation reform of Changma reservoir power station
下载PDF
导出
摘要 为了进一步提高昌马水库电站输电效率,降低电能损耗,结合电站自身实际情况,提出新增一种接线方式,即近区有负荷的单母线主接线方式。这种接线方式专门在蓄水期或检修期投入运行,从而降低电能输出时的损耗,达到节能改造的目的。 In order to further improve transmission efficiency of Changma reservoir power station,and reduce energy loss,combined with the actual situation of this power station,this paper puts forward a new main connection mode,namely the near single busbar connection mode with load.This kind of connection mode is dedicated to be in operation during water storage or maintenance to reduce the loss of the output of the power,which eventually achieves the goal of energy saving reconstruction.
作者 马虎林 MA Hulin(Shule River Basin Resources Authority of Gansu Province,Yumen 735200,China)
出处 《宁夏工程技术》 CAS 2018年第1期20-22,共3页 Ningxia Engineering Technology
关键词 节能 主接线 昌马水库电站 energy conservation main connection mode Changma reservoir power station
  • 相关文献

参考文献3

二级参考文献11

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部