武汉沌口长江公路大桥项目核准前期工作总结

Summary of Preliminary Work for Approval of Wuhan Zhuankou Yangtze River Highway Bridge Project
下载PDF
导出
摘要 作者根据自身工作经历,结合武汉沌口长江公路大桥项目核准实操经验,对投资体制改革后长江大桥项目的核准程序和审批环节进行了系统的阐述,对核准审批所需必备要件进行了全面的梳理。武汉沌口长江大桥项目前期工作的实践和总结,极具实操性和借鉴性,为企业及行业内开展国家发改委核准的其他投资项目提供了宝贵的经验。 Based on working experience of the author,combining with the practical experience of the approval of the Yangtze River Bridge Project in Zhuankou,Wuhan,the author systematically elaborated the approval procedure and approval links of the Zhuankou Yangtze River Bridge Project after the investment system reform,and comprehensively combed out the necessary requirements for the approval work.The summary of the pre-work of Wuhan Zhuankou Yangtze River Bridge Project is very practical and referential,which provides valuable experience for other investment projects approved by NDRC in enterprises and industries.
作者 刘俊才 LIU Jun-cai(CCCC Wuhan Zhuankou Yangtze River Bridge Investment Co.Ltd.,Hubei wuhan 430056,China)
出处 《中小企业管理与科技》 2018年第11期118-120,共3页 Management & Technology of SME
关键词 沌口长江公路大桥项目 核准 前期工作 核准程序 必备要件 Yangtze River Bridge Project in Zhuankou approval preliminary work approval process essential elements
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部