摘要
特长隧道多采用双向掘进施工方式,贯通误差是施工控制的关键。文章分析了贯通误差产生的原因,并结合工程实例,介绍了特长隧道双向施工中控制贯通误差的相应措施。
The bidirectional tunneling construction method is mostly adopted for the extra-long tunnels,and the penetration error is the key to construction control.This article analyzed the causes of penetration error,and introduced the corresponding measures to control the penetration error during the bidirectional construction of extra-long tunnel in combination with the engineering examples.
作者
王宇
WANG Yu(Pavement Company of Guangxi Road and Bridge Engineering Group Co.,Ltd.,Nanning,Guangxi,530023)
出处
《西部交通科技》
2018年第1期113-114,130,共3页
Western China Communications Science & Technology
关键词
特长隧道
双向贯通
开挖轮廓线
单导线
Extra-long tunnel
Bidirectional penetration
Excavation of contour line
Single conductor