期刊文献+

抽提蒸馏塔与再沸器的平面布置及管道设计

Layout and Piping Design of Extractive Distillation Tower and Reboiler
下载PDF
导出
摘要 以某公司0.55Mt/a芳烃抽提装置为例,介绍了抽提蒸馏塔与其中段再沸器、塔底再沸器的平面布置及管道设计的特点。满足工艺要求并在工艺校核后,确定再沸器的安装高度。采用支耳处设置弹簧、取消螺栓孔以及增加聚四氟乙烯板等方法,来消除竖向和横向应力,为同类设备的管道设计工作提供参考。 This paper gives an example of 0.55Mt/a aromatics extract unit to present the equipment layout and piping design of extractive distillation tower,middle section reboiler and bottom reboiler.The installing height of middle section reboiler need to meet the process demands and checking.Using spring support,canceling bolt holes and putting Polytetrafluor ethylene at the supporting plate of reboiler can eliminate vertical and horizontal stress.These will provide a good reference for the pipe engineering design of similar equipment.
作者 管晓玉 Guan Xiaoyu(SINOPEC Guangzhou Petrochemical Engineering Corporation,Guangzhou 510000,China)
出处 《山东化工》 CAS 2018年第7期124-125,127,共3页 Shandong Chemical Industry
关键词 抽提蒸馏塔 再沸器 平面布置 管道设计 extractive distillation tower reboiler piping desig, equipment layout piping design
  • 相关文献

参考文献4

二级参考文献12

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部