摘要
结合红水河大化水电站汛期出现的非正常溢流工况,研究该工况对枢纽建筑物安全以及机组稳定运行的影响。并针对该工况可能造成的不利影响提出合理的建议和应对措施,为今后类似的水电站工程安全运行提供借鉴与参考。
This paper studies the impact of abnormal overflow condition on the safety of structures and stable operation of units in Dahua Hydropower Station in flood season.It proposes reasonable suggestions and countermeasures for possible adverse impacts of this condition,providing reference for safe operation of similar hydropower stations in the future.