摘要 对于现场施工来讲,成本控制应当是核心性的要素。近些年以来,铁路施工的整体规模正在迅速扩大,而与之相应的工程成本控制也实现了优化与改进。在当前现有的铁路工程中,通常都会涉及到现场预制梁,对其如果能够予以全方位的成本控制那么将会减少成本并且增添企业拥有的综合性利润。因此可见,有效控制工程成本对于铁路施工具备不可忽视的价值。铁路现场预制梁包含了多样化的复杂施工要素,因此应当将成本控制全面融入现阶段的铁路施工中。 In terms of on-site construction,cost control should be the core element.In recent years,the overall scale of railway construction is rapidly expanding,and the corresponding project cost control has also been optimized and improved.In the current existing railway projects,on-site prefabricated beams are usually involved.If they can provide full-scale cost control,it can reduce costs and increase the overall profits.Therefore,the effective cost control has a significant value for railway construction.The prefabricated beam of the railway contains a variety of complex construction elements.Therefore,the cost control should be fully integrated into the railway construction at this stage.
作者 任双玲 REN Shuang-ling(The 3rd Engineering Co.,Ltd.of China Railway 12th Bureau Group,Taiyuan 030000,China)
出处 《价值工程》 2018年第14期57-59,共3页 Value Engineering
关键词 铁路现场预制梁 工程成本控制 具体措施 railway prefabricated beam engineering cost control specific measures
  • 相关文献

参考文献3

二级参考文献6

共引文献6

同被引文献10

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部