摘要
(60m+100m+60m)连续梁的施工是西宝客专陕西段中铁一局第一项目部的节点工期控制目标,直接影响梁体架设及线上工程的施工。本文阐述了通过如下工艺控制,在确保施工安全质量的前提下,实现节点目标并有效的控制材料,提高经济效益,而且施工中并不影响桥下交通。
The construction of(60m+100m+60m)continuous beam is the node project control target of the first project department of the China Railway First Group for Xibao Passenger Dedicated Railway Shaanxi Section,which directly affects the construction of the beam body and the online construction.This article elaborates that through the following process control,under the premise of ensuring construction safety and quality,it can achieve node goals and effectively control materials and improve economic efficiency,and the construction does not affect the traffic under the bridge.
作者
罗党庆
LUO Dang-qing(China Railway First Group,Xi'an 710054,China)
出处
《价值工程》
2018年第14期141-143,共3页
Value Engineering
关键词
连续梁
施工工艺
现浇
continuous beam
construction process
cast-in-place