为提高抽水蓄能电站机电技术管理水平,依据多年工作经验,总结了广东清远抽水蓄能电站建设过程中机电设备的设计、制造、安装、调试全过程管理和质量管控的经验和亮点,可为国内外同类机组的技术管理提供有益的参考。
To improve the electromechanical technology management level of pumped storage power station,based on years of work experience,experience and highlights in management and quality control are summarized in the whole process of design,manufacturing,installation and commissioning of E&M equipment during the construction of the Qingyuan Pumped Storage Power Station in Guangdong,to provide helpful reference for the technology management of units of the same type at home and abroad.
作者
陈泓宇
汪志强
吕志鹏
季怀杰
CHEN Hong-yu;WANG Zhi-qiang;LV Zhi-peng;JI Huai-jie(Qingyuan Pumped Storage Power Station Co.5 Ltd.,Qingyuan 511853,China)
出处
《水电站机电技术》
2018年第4期74-77,86,100,共5页
Mechanical & Electrical Technique of Hydropower Station
关键词
清远
抽水蓄能
机电设备
建设
调试
Qingyuan
Pumped storage
E&M equipment
Construction