摘要
以深圳地铁9号线地铁工程为例,针对地铁施工工程量大、工期紧、技术难点多的特点,为解决施工中的技术难题,采用BIM技术指导施工。基于工程图纸和三维模型的建立,从生产管理、技术管理、成本管理等多方面解决复杂的地铁工程现场施工问题。
Taking the subway project of the Shenzhen Metro Line 9 as an example,the BIM technology has been applied to the entire process of construction management in view of the large amount of construction work,tight schedules,and many technical difficulties.Based on the establishment of engineering drawings and three-dimensional models,it solves complex on-site construction problems of subway projects from various aspects such as production management,technical management,and cost management.
作者
孙贤斌
刘倍
SUN Xianbin;LIU Bei(School of Civil Engin.,Architecture and Environment,Hubei Univ.of Tech.,Wuhan 430068 China)
出处
《湖北工业大学学报》
2018年第2期87-90,共4页
Journal of Hubei University of Technology
关键词
BIM
施工管理
工程量
施工进度
碰撞检测
BIM
construction management
engineering quantity
construction progress
collision detection