BIM技术在地铁施工管理中的应用研究 被引量:6

Application of BIM Technology in Subway Construction Management
下载PDF
导出
摘要 以深圳地铁9号线地铁工程为例,针对地铁施工工程量大、工期紧、技术难点多的特点,为解决施工中的技术难题,采用BIM技术指导施工。基于工程图纸和三维模型的建立,从生产管理、技术管理、成本管理等多方面解决复杂的地铁工程现场施工问题。 Taking the subway project of the Shenzhen Metro Line 9 as an example,the BIM technology has been applied to the entire process of construction management in view of the large amount of construction work,tight schedules,and many technical difficulties.Based on the establishment of engineering drawings and three-dimensional models,it solves complex on-site construction problems of subway projects from various aspects such as production management,technical management,and cost management.
作者 孙贤斌 刘倍 SUN Xianbin;LIU Bei(School of Civil Engin.,Architecture and Environment,Hubei Univ.of Tech.,Wuhan 430068 China)
出处 《湖北工业大学学报》 2018年第2期87-90,共4页 Journal of Hubei University of Technology
关键词 BIM 施工管理 工程量 施工进度 碰撞检测 BIM construction management engineering quantity construction progress collision detection
  • 相关文献

参考文献9

二级参考文献81

共引文献435

同被引文献27

引证文献6

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部