摘要
以榆林神华郭家湾煤矿基建项目质量管理为背景,阐述了项目质量过程管控在招标、监理、原材料入场等阶段存在的影响因素,并针对影响因素进行对策研究,提出了改进实施方案。
Taking the quality management of capital construction project in Yulin Shenhua Guojiawan coal mine as the background,the influencing factors of the project quality process control in the stages of bidding,supervision and raw material entry were analyzed,and some improvement plans were proposed according to the influencing factors.
作者
王永刚
WANG Yong-gang(Guojiawan Coal Mine Branch,Yulin 719000,China)
出处
《陕西煤炭》
2018年第2期129-131,共3页
Shaanxi Coal
关键词
工程质量管理
合理低价中标
小业主、大监理
project quality management
reasonable low price winning bid
small owner and supervision