期刊文献+

200MW超高压抽凝式汽轮机组高背压改造的可行性研究 被引量:5

Feasibility Study on High Backpressure Reform of 200MW Ultra-high Pressure Extraction Condensing Turbine
下载PDF
导出
摘要 当今电力市场200 MW以下机组生存空间越来越小,在东北、内蒙等地区冬季供暖需求量大,通过高背压改造,提高了机组的排汽温度,实现了冬季供暖期间机组排汽余热的利用是拯救老200MW机组最有前景的方案之一。文中对C145/N200-12.7/535/535型汽轮机高背压改造的可行性进行了分析。 Under the demand of power market,the living space of units under 200MW is getting smaller and smaller.In northeast China and inner mongolia,there is a large demand for winter heating.Through high backpressure transformation,the exhaust temperature of the unit is increased,and the utilization of waste heat from the exhaust of the unit during winter heating is one of the most promising solutions for saving the old 200MW unit.The feasibility of retrofitting high back pressure of C145/N200-12.7/535/535 steam turbine is analyzed in this paper.
作者 周博 ZHOU Bo(HarbinTurbine Company Limited,Harbin 150046,China)
出处 《机械工程师》 2018年第4期133-135,138,共4页 Mechanical Engineer
关键词 汽轮机 低真空 光轴 供热 改造 安全 steam turbine low vacuum optical axis heating renovation safety
  • 相关文献

参考文献17

二级参考文献34

共引文献54

同被引文献16

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部