期刊文献+

浅谈DP3船舶闭合环网的电力系统设计要点 被引量:3

Discussion on the Main Points of Power System Design of DP3 Ship Closed Loop Network
下载PDF
导出
摘要 随着社会发展,船舶闭合环网的配电系统为广大船东所追求,但因其复杂的设计、安装和试验要求,严重影响其在船舶上的应用,特别是DP3船舶上。论文基于DNVGL船级社的最新相关规范要求和指导文件,全面分析DP3船舶的闭合环网电力系统的设计要求及注意事项。 With the development of society,the distribution system of closed loop network for ships is pursued by many shipowners.However,due to its complicated design,installation and test requirements,it seriously affects its application in ships,especially on DP3 ships.Based on the latest requirements and guidance documents of DNVGL classification society,this paper analyzes the design requirements and matters needing attention of DP3 closed loop network power system comprehensively.
作者 宋秀丽 SONG Xiu-li(China Merchants Heavy Industry(Shenzhen)Co.Ltd.,Shenzhen 518054,China)
出处 《中小企业管理与科技》 2018年第12期141-143,共3页 Management & Technology of SME
关键词 DP3船舶 闭合环网 电力系统设计 DP3 ship closed loop network power system design
  • 相关文献

同被引文献10

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部