摘要
为预计采煤沉陷和高填方沉降双重影响下的地表移动变形,以阳泉市采煤沉陷区"光伏领跑者"计划技术基地某光伏地块为研究对象,在分析煤层埋藏特征、开采方法和地表煤矸石堆积、沉降变形特点的基础上,研究了老采空区地表残余变形和煤矸石高填方沉降变形预计方法,提出了2种变形联合预计的技术思路,预计结果为采煤沉陷区光伏建设提供可靠依据。
In order to predict surface movement deformation under double influence of mining subsidence and high fill setting,it taking one photovoltic plot of‘photovoltic pacemaker’plan technical base within mining subsidence of Yangquan city as studying object,and then coal seam buried characteristics,mining method and surface gangue stacking and subsidence deformation variation were analyzed,the predicting method of surface residual deformation of old goaf and gangue high fills setting were analyzed,and two kinds of deformation combined predicting method were put forward,it references for photovoltic constructed in mining subsidence.
作者
孙庆先
李杰
陈清通
林惠立
李宏杰
SUN Qing-xian;LI Jie;CHEN Qing-tong;LIN Hui-li;LI Hong-jie(Safety Institute,China Coal Research Institute Co.,Ltd.,Beijing 100013,China;State Key Laboratory of Coal Resource High Effective Mining&Clean Utilization(China Coal Research Institute),Beijing 100013,China)
出处
《煤矿开采》
北大核心
2018年第2期72-74,共3页
Coal Mining Technology
基金
国家自然科学基金资助项目(51674142)
中国煤炭科工集团基金资助项目(2017MS003)