期刊文献+

基于数控车床加工精度的影响因素分析及应对策略探究 被引量:34

Analysis of Influencing Factors and Countermeasures Based on NC Lathe Machining Precision
下载PDF
导出
摘要 随着科学技术的不断发展和创新,越来越多的先进技术和工艺应用到加工生产领域,促使生产效率和生产质量得到显著提升。数控车床作为一种前沿的加工技术,具有较高的加工水平和精度水平,对工件质量和性能具有决定性的影响。数控车床可通过计算机技术实现数字化控制,自动化水平较高,以其独特的优势被广泛应用在机械加工领域。但是,数控车床加工工艺繁琐,很容易受到客观因素影响,为机械加工埋下质量隐患。本文就数控车床加工精度的影响因素进行深层次探究,从多种角度来提出有效对策,以求保证加工质量和精准度,以求推动机械加工领域的发展。 With continuous development and innovation of science and technology,more advanced technology and technics have been applied in processing and production field,which improve production efficiency and quality significantly.As a cutting edge machining technology,NC lathe has high level of machining and precision,which has a decisive influence on quality and performance of workpiece.NC lathe has been widely applied in mechanical processing field for its unique advantages of digital control of computer technology and high automation level.However,machining of NC lathe is easily influenced by objective factors for its characteristics,causes hidden quality danger for machining processing.The article explores influencing factors of NC lathe machining precision further,and puts forward effective countermeasures from various angles,to ensure machining quality and precision and promote development of machine processing field.
作者 顾宏 GU Hong(Huaibei Industrial and Art School,Huaibei,Anhui 235026,China;Anhui Huaibei Technician College,Huaibei,Anhui 235026,China)
出处 《新型工业化》 2018年第2期64-67,共4页 The Journal of New Industrialization
关键词 数控车床 加工精度 影响因素 自动化控制 NC lathe Machining precision Influencing factors Automatic control
  • 相关文献

参考文献11

二级参考文献51

  • 1刘炜.数控加工中心自动换刀系统[J].机床与液压,2005,33(5):58-58. 被引量:13
  • 2陈传波,赵伟伟.一种自主工作流任务分配策略[J].华中科技大学学报(自然科学版),2005,33(6):20-22. 被引量:7
  • 3李建广,姚英学,刘长清,黎世文.基于遗传算法的车削用量优化研究[J].计算机集成制造系统,2006,12(10):1651-1656. 被引量:27
  • 4肖郑进,何钦铭,陈奇.模糊环境中工作流任务分配的多级模型[J].计算机研究与发展,2007,44(2):302-309. 被引量:21
  • 5Poggenpohl Frank-Gerrit,Guttinger Dennis. Optimizing Task Allocation on Fire Fighting[A].Bucharest,Romania,2012.0497-0502.
  • 6Shahhosseini V,Sebt M H. Competency-Based Selection and Assignment of Human Resources to Construction Projects[J].Scientia Iranica,2011,(2 A):0163-0180.
  • 7Duffuaa S O,AL-Sultan K S. A Stochastic Programming Model for Scheduling Maintenance Personnel[J].Applied Mathematical Modelling,1999,(03):0323-0343.doi:10.1016/S0307-904X(98)10009-4.
  • 8e Silva L C,Costa A P C S. Decision Model for Allocating Human Resources in Information System Projects[J].International Journal of Project Management,2013,(01):0100-0108.
  • 9WANG Y M;YU X L.Research on Task Allocation for Product Cooperative Development[A]北京,20090240-0243.
  • 10WANG L W,ZHANG Y,FENG J F. On the Euclidean Distance of Images[J].IEEE Transactions on Pattern Analysis and Machine Intelligence,2005,(08):1334-1339.doi:10.1109/TPAMI.2005.165.

共引文献81

同被引文献130

引证文献34

二级引证文献124

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部