期刊文献+

基于寿命空间划分的多部件系统维修决策 被引量:1

Optimal Maintenance Decision for Multi-unit Systems Based on Joint Lifetime Space Partition
下载PDF
导出
摘要 针对多部件系统!提出了基于时间的机会维修策略,将退化状态空间划分方法应用到多部件系统联合寿命空间的划分建模研究中,对任意的多部件系统联合寿命空间进行了统一的描述和建模,并建立了维修需求组合及其划分结果的对应关系。依据联合寿命空间的划分结果,推导了各个维修需求的概率统一的计算模型。以两部件系统为例,推导了系统的稳态联合概率密度函数,并建立了费用率模型,通过遗传算法进行寻优得到最优的维修阈值。最后,通过MATLAB数值实验验证了联合寿命空间划分建模方法可行有效性。 The opportunistic maintenance policy with TBM for multi-unit systems is proposed and the deterioration state space partition method is applied to the joint life space partition and modeling for multi-unit systems.The common description and the model of joint-life space partition for multi-component system with TBM is represented.According to the partition results,all possible maintenance combinations and the corresponding probabilities are deduced for a general multi-component system.Further,taking a two-component systems as an example,the stationary probabilistic density function and the cost rate model are established and then the optimal maintenance threshold is obtained by genetic algorithm.Finally,numerical experiment is given for illustrating the correctness and validity of the applications for the method.
作者 王玉亮 张晓红 曾建潮 WANG Yu-liang;ZHANG Xiao-hong;ZENG Jian-chao(Division of Industrial and System Engineering,Taiyuan University of Science&Technology,Taiyuan 030024,China;College of Mathematics&Computer Science,North University of China,Taiyuan 030051,China)
出处 《太原科技大学学报》 2018年第5期331-337,共7页 Journal of Taiyuan University of Science and Technology
基金 国家自然科学基金(61573250) 山西省青年基金(201601D021082) 太原科技大学校博士启动基金(20152021)
关键词 多部件系统 基于时间的机会维修 联合寿命空间 联合概率密度 费用率模型 multi-component time-based opportunistic maintenance joint life-space stationary probabilistic density function cost rate model
  • 相关文献

参考文献4

二级参考文献30

  • 1程志君,高大化,黄卓,郭波.不完全维修条件下的视情维修优化模型[J].系统工程与电子技术,2006,28(7):1106-1108. 被引量:15
  • 2蔡景,左洪福,王华伟.多部件系统的预防性维修优化模型研究[J].系统工程理论与实践,2007,27(2):133-138. 被引量:38
  • 3Dekker R,Van der Duyn Schouten F A,Wildeman R E.A review of multi-component maintenance models with economic dependence[J].Mathematical Methods of Operations Research,1997,45:411-435.
  • 4Archibald T W,Dekker R.Modified block-replacement for multiple-component systems[J].IEEE Transacfions on Reliability,1996,45(1):75-83.
  • 5Dekker R,Roelvink I F K.Marginal cost criteria for preventive replacement of a group of components[J].European Journal of Operational Research,1995,84:467-480.
  • 6Wang W,Christer A H.Solution algorithms for a no homogeneous multi-component inspection model[J].Computers & Operations Research 2003,30:19-34.
  • 7Tatsuno K,Ohi F,Nishida T.Opportunistic maintenance pokey with minimal repair[J].Mathematics Japonica,1983,28:327-335.
  • 8Jiansheng Huang.Preventive replacement/maintenance program development and evaluation for multi.unit system with economic dependency[D].Univemity of South Florida Tampa,Florida,1993.
  • 9DEKKER R,VANDER D F,WILDEMAN R. A review of multi-component maintenance models with economic depend enee[J].Mathematics of Operations Research,1996,(03):411-435.
  • 10KECECIOGLU D,SUN F B. A general discrete-time dynamic programming model for the opportunistic replacement policy and its application to ball-bearing systems[J].Reliability En-gineering and System Safety,1995,(03):175-185.

共引文献65

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部