期刊文献+

基于统计方法的频率波动原因分析 被引量:3

Analysis of Statistical Method of Frequency Fluctuation Reasons
下载PDF
导出
摘要 近年来,某电网的频率合格率指标一直为100%,没有发生频率越限的事故。但通过对比发现,频率在0.05 Hz附近的波动幅度和频数较以前有所增加,利用统计方法分析各因素的相关性和相关程度,并讨论解决办法。 In recent years,frequency qualified rate index of some power grid has reached 100%with no frequency accident occurred.By comparison,frequency qualified rate index in 0.05 Hz has been increased.This paper analyzes the correlation and the degree of cor-relation by using statistical methods.
作者 刘洋 王聪颖 陈瑾平 姚恺丰 杨雪瑞 LIU Yang;WANG Congying;CHEN Jinping;YAO Kaifeng;YANG Xuerui(Northeast Branch Electricity Regulation Center of State Grid Corporation of China,Shenyang,Liaoning 110018,China;China Energy Engineering Group Liaoning Electric Power Survey&Design Institute Co.,Ltd.,Shenyang,Liaoning 110180,China)
出处 《东北电力技术》 2018年第5期28-30,33,共4页 Northeast Electric Power Technology
关键词 频率波动 统计方法 相关性 frequency fluctuation statistical methods correlation
  • 相关文献

参考文献5

二级参考文献79

  • 1王志征,余岳峰,姚国平.主成份分析法在电力负荷预测中的应用[J].电力需求侧管理,2003,5(3):21-24. 被引量:18
  • 2Heinemann G T, Nordman D A, Plant E C. The Relationship Between Summer Weather and Summer Loads-a Regression Analysis[J]. IEEE Trans on PAS, 1996, 85(11):1144-1154.
  • 3D'Adamo C, Jupe S, Abbey C. Global survey on planning and operation of active distribution networks: update of CIGRE C6.11 working group activities[C]//CIRED 2009(20th International Conference on Electricity Distribution). Prague, CZ: IET Services Ltd, 2009: 1-4.
  • 4Celli G, Ghiani E, Mocci S, et al. Reliability assessment of active distribution networks[C]//CIGRE 2010. Paris, France: Cigr6 Technical Committee, 2010: 1-9.
  • 5Pilo F, Celli G, Mocci S, et al. Multi-objective programming for optimal DG integration in active distribution systems[C]//Power and Energy Scociety General Meeting, 2010 IEEE:Minneapolis, MN, USA. IEEE, 2010: 1-7.
  • 6Celli G, Pilo F, Soma G G, et al. Active distribution network cost/benefit analysis with multi-objective programming [C]//CIRED 2009 (20th International Conference on Electricity Distribution). Prague, CZ: IET Services Ltd, 2009: 1-5.
  • 7Pilo F, Pisano G, energy resources management[J] . Electronics, 2011, Soma G G. Optimal coordination of with atwo-stage online active IEEE Transactions on Industrial 10(58): 4526-4537.
  • 8CeUi G, Mocci S, Pilo F. Multi-year optimal planning of active networks[C]//CIRED 2007 (19th International Conference on Electricity Distribution). Vienna, Austria: IET Services Ltd, 2007: 0690.
  • 9Pilo F, Pisano G, Soma G G. Advanced DMS to manage active distribution networks[C]//Power Tech, 2009 IEEE Bucharest. Bucharest, Romania: IEEE, 2009: 1-8.
  • 10Fan Mingtian, Zhang Zuping, Su Aoxue. A planning approach for active distribution networks[C]// CIRED2011 (2 1 th International Conference on Electricity Distribution). Frankfurt, Germany: IET Services Ltd, 2011: 1-4.

共引文献403

同被引文献31

引证文献3

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部