期刊文献+

多块混凝土板拼装组合钢板剪力墙试验与有限元参数影响研究 被引量:4

EXPERIMENTAL AND ANALYTICAL STUDY OF COMPOSITE STEEL PLATE SHEAR WALL WITH ASSEMBLED MULTI-CONCRETE SLAB
下载PDF
导出
摘要 对竖向拼装组合钢板剪力墙、横向拼装组合钢板剪力墙及传统组合钢板剪力墙开展拟静力试验,对比分析各试件破坏特征、滞回性能、耗能能力、刚度退化及位移延性,采用ABAQUS软件建立数值模型并针对不同拼缝宽度、螺栓距厚比和混凝土板厚度的竖向拼装组合钢板剪力墙进行了参数影响研究。结果表明:混凝土板分块布置会一定程度地降低其耗能能力和抗侧刚度,但可以减少内藏钢板对边缘框架柱产生附加弯矩的不利影响;竖向拼装组合钢板剪力墙是一种抗震性能更为优越的抗侧力构件,竖向拼装组合钢板剪力墙的耗能能力是横向拼装组合钢板剪力墙的1.3倍,且竖向拼装组合钢板剪力墙刚度退化相对缓慢;为保证组合钢板剪力墙具有较好的抗侧能力,螺栓距厚比为100和125时,其拼缝宽度分别不宜大于48 mm和72 mm;混凝土板约束刚度足够情况下,螺栓距厚比不宜大于125。 The quasi-static test was carried out on composite steel plate shear wall with vertical assembling mode(V-CSPSW),composite steel plate shear wall with horizontal assembling mode(H-CSPSW)and traditional composite steel plate shear wall(CSPSW).The failure characteristic,hysteretic behavior,energy dissipation capability,displacement ductility,stiffness degradation and displacement ductility of the composite walls were analyzed.The numerical model was established by using ABAQUS,and a parametric study was then performed to study the effects of gap width,bolt spacing-to-steel thickness ratio and concrete slab thickness.The results show that the CSPSW assembled by multi-concrete slabs has lower lateral stiffness and energy dissipation capacity,but it can reduce the harmful effects of additional moment generated by the steel plate on frame columns.V-CSPSW is a lateral force resisting member possessing superior seismic performance,its energy dissipation capacity is 1.3 times of that the H-CSPSW has and its stiffness degradation is slower.In order to ensure the composite steel plate shear wall has good lateral resisting capacity,the gap width should be less than 48 mm and 72 mm if the bolt spacing-to-steel thickness ratio is 100 and 125,respectively.The bolt spacing-to-steel thickness ratio of the V-CSPSW should be less than 125 if the concrete slab possesses enough restraint stiffness.
作者 汪大洋 韩启浩 张永山 WANG Da-yang;HAN Qi-hao;ZHANG Yong-shan(School of Civil Engineering,Guangzhou University,Guangzhou,Guangdong 510006,China)
出处 《工程力学》 EI CSCD 北大核心 2018年第7期83-93,138,共12页 Engineering Mechanics
基金 国家自然科学基金项目(51408140 51378135) 广东省优秀青年教师项目(Yq201402) 广州市科技计划项目(201510010291 201607010151)
关键词 组合钢板剪力墙 多块混凝土板 拼装方式 拟静力试验 有限元分析 拼缝宽度 抗震性能 composite steel plate shear wall multi-concrete slab assembling mode quasi-static test finite element analysis gap width seismic behavior
  • 相关文献

参考文献10

二级参考文献68

共引文献444

同被引文献15

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部