摘要
国投塔山煤矿工广井口范围布置较小,无法采用串车提升,为满足合同进度要求,解决副斜井扩刷施工中的排矸难题,制作加工一套侧卸式翻矸架,经过安装使用,解决了排矸的难题,达到了预期的进度效果及目标。
Aiming at the failure to use trip in hoisting due to the small wellhead range,the authors present a set of side-dump gangue-strike frame to solve the problem of refuse disposal in expansion construction in auxiliary shaft,which has achieved the expected effect and target of the contract progress.
作者
刘露生
谢芝明
张帆
夏云龙
袁佳
Liu Lu Sheng;Xie Zhiming;Zhang Fan;Xia Yunlong;Yuan Jia(Mining Tunnel Construction Branch of CTCI International Engineering Co.,Ltd.,Nanchang,Jiangxi 330096)
出处
《江西煤炭科技》
2018年第3期167-168,171,共3页
Jiangxi Coal Science & Technology
关键词
侧卸式
翻矸架
箕斗
side-dump
gangue-strike frame
skip