期刊文献+

火电厂动力驱动泄放阀配置及排量计算分析

Configuration and Capacity Calculation of Power-actuated Pressure Relief Valve in Thermal Power Plants
下载PDF
导出
摘要 火电厂动力锅炉上配备的动力驱动泄放阀是对锅炉提供超压保护的重要设备,但在实际应用中,很多电厂对动力驱动泄放阀的配置未予足够重视,未能正确执行ASME和电力行业标准规范的相关要求,给锅炉安全运行带来隐患。介绍了相关标准对动力驱动泄放阀的配置要求;分析了动力驱动泄放阀在电厂实际应用中存在的问题并提出了解决方案;通过计算分析缩径手动隔离球阀对排量的不利影响,提出按照相关标准规范合理、正确配置动力驱动泄放阀的必要性和重要性。 The power-actuated pressure relief valve(PCV valve)equipped in the thermal power plant boiler is a vital equipment to provide overpressure protection for the boiler.However,in practice,many power plants do not pay enough attention to the configuration of the power drive discharge valve and do not always follow the requirements of ASME and the electric industrial standards which definitely brings hidden dangers to the boiler operation.This paper introduces the relevant standards on the PCV valve configuration,analyzes the existing problems in practice and proposes the solutions.By calculating the adverse effect of manual isolation ball valve with reduced diameter on the discharge capacity,the necessity and importance of properly configuring the PCV valve following the standards are emphasized.
作者 张传虎 陈萱 张中洲 田松峰 唐惠锋 刘建民 胡为祖 鹿焕成 ZHANG Chuanhu;CHEN Xuan;ZHANG Zhongzhou;TIAN Shongfeng;TANG Huifeng;LIU Jianmin;HU Weizu;LU Huancheng(Wuhan Huake Energy Environment Science&Technology Co.,Ltd.,Wuhan 430074,China;Guangdong Yudean Group Co.,Ltd.,Zhuhai Power Plant,Zhuhai 519000,China;Nanyang Yahekou Tianyi Power Generation Co.,Ltd.,Nanyang 474671,China;North China Electric Power University,Baoding 071003,China;Henan Huayushengda Special Equipment Inspection Technology Co.,Ltd.,Jiaozuo 542150,China;Xi'an University of Technology,Xi'an 710082,China;Anhui Association of Special Equipment,Hefei 230051,China;Hubei Huakeruicheng Standardization Firm,Wuhan 430074,China)
出处 《中国电力》 CSCD 北大核心 2018年第7期103-107,共5页 Electric Power
关键词 火电厂 锅炉 动力驱动泄放阀 配置 手动隔离球阀 排量 thermal power plant boiler power-actuated pressure relief valve(PCV valve) configuration manual isolation ball valve discharge capacity
  • 相关文献

参考文献5

二级参考文献24

  • 1邱晓来.安全阀排量系数与开启高度关系的试验研究[J].流体工程,1989,17(7):1-4. 被引量:13
  • 2奚永明.安全阀排量计算公式的分析[J].石油化工设备,1996,25(1):38-40. 被引量:1
  • 3GB/T12243-2005,弹簧直接载荷式安全阀[S].
  • 4API Recommended Practice 520- 2003, Sizing, Selection, and Installation Of Pressure - Relieving Devices in Refineries, Part Ⅱ Installation, 5th Edition [S).
  • 5API Standard 526 - 2002, Flanged Steel Pressure Relief Valves, 5th Edition [S].
  • 6SH3012-2000,石油化工管道布置设计通则[S].
  • 7D. W. Sallet. An Experimental Investigation of Internal Pressure and Flow Fields in a Safety Valve [M]. 1981, ASME 81 - WA/NE - 19.
  • 8D. W. Sallet, Thermal Hydraulics of Valves for Nuclear Applications, Nuclear Science and Engineering [J]. 1984, 88, 220- 244.
  • 9ASME - 1581, An Experimental Investigation of Internal Pres- sure and Flow Fields in a Safety Valve [ S ].
  • 10Sallet D W. Thermal Hydraulics of Valves for Nuclear Applica- tions [J]. Nuclear Science and Engineering, 1984, 88:220 - 244.

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部