摘要
华能长春热电厂新建工程(2×350MW)烟气脱硫系统工程临时烟囱设计方案,脱硫吸收塔的有关设计数据及主要技术标准规范等,均通过ANSYS有限元分析软件建立数学模型进行计算分析校核。
This paper focuses on the introductions of temporary chimney engineering design for the FGD systems engineering in the new-built project(2×350MW)of Huaneng Changchun Thermo-power Plant,and the design data and main technical standards and criterions of FGD absorber.The mathematical model is established,analyzed and checked through the finite element analysis software of ANSYS.
作者
王锐
WANG Rui(Hunan Green Star Environmental Protection Co.,Ltd,Changsha 410205,China)
出处
《中国环保产业》
2018年第8期39-42,共4页
China Environmental Protection Industry
关键词
湿法烟气脱硫
脱硫吸收塔
临时烟囱
塔壁
斜向拉杆
有限元分析
FGD
absorber of desulfurization
temporary chimney
way-out flue
tower wall
oblique rod
finite element analysis