PPP模式下社会资本退出问题研究 被引量:1

Research on the Problems of Social Capital Withdrawal under PPP Model
下载PDF
导出
摘要 PPP模式在公用基础设施领域应用广泛,但具体操作过程存在诸多问题,并会导致社会资本的退出。基于我国PPP项目现状,分析社会资本退出政策,然后分析社会资本退出的原因和影响因素。在此基础上提出完善社会资本退出机制的建议,以期为PPP项目中社会资本退出的管理提供参考。 The PPP model has been widely used in the field of public infrastructure,but there are many problems in the specific operation process that may lead to the withdrawal of social capital.Based on the status of China’s PPP projects,this paper analyzes social capital withdrawal policy,and then analyzes the causes and influencing factors of social capital withdrawal.Based on this,puts forward suggestions to improve the withdrawal mechanism of social capital,so as to provide references for the management of social capital withdrawal in PPP projects.
作者 代仁强 徐淦开 DAI Renqiang;XU Gankai(Guangzhou Construction Science and Technology Committee Office,Guangzhou 510030,China)
出处 《工程经济》 2018年第7期66-68,共3页 ENGINEERING ECONOMY
关键词 PPP模式 社会资本 退出 影响因素 PPP model social capital withdrawal influencing factor
  • 相关文献

参考文献4

二级参考文献52

共引文献67

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部