摘要
伴随着经济的飞速发展,铁路运输的周转率也持续增长,对铁路工务系统的要求也越来越高。各专业在综合利用天窗进行维修和施工作业时,在某一区间会出现重叠和交叉作业,随之带来了诸多管理问题。本文结合相关规定和各专业相关要求,分析综合作业存在的管理问题,探究管理对策,确保综合施工高效顺利进行。
With the rapid development of economy,the turnover rate of railway transportation continues to increase,and the requirements of railway public works system are becoming higher and higher.In the comprehensive use of skylights for maintenance and construction,there will be overlapping and cross-operation in a certain section,which brings a lot of management problems.This paper analyzes the management problems existing in the comprehensive operation and explores the management countermeasures in order to ensure the efficient and smooth progress of the comprehensive construction in the light of the relevant regulations and relevant requirements of various specialties.
作者
黄先雷
HUANG Xianlei(China Shenhua Track Mechanized Maintenance Branch Company,Yulin,Shaanxi,719000)
出处
《神华科技》
2018年第6期74-76,共3页
Shenhua Science and Technology
关键词
铁路综合作业
主体作业负责人
机械化清筛施工
Railway integrated operation
Principal operations manager
Mechanized sieve cleaning construction