摘要
文中通过对松原壅水坝库区左岸浸没问题的三维研究,真实地反映和模拟了库区左岸天然工况和蓄水工况的地下水系统的三维结构和渗流特征,确定了这次工程给浸没带来的影响,使计算结果更加真实、可信。
Through the three-dimensional study of the immersion problem on the left bank in reservoir of backwater dam in Songyuan City, the three-dimensional structure and seepage characteristics of the groundwater system under the natural and impoundment conditions on the left bank of the reservoir area are truly reflected and simulated, the impact of this project on the immersion is determined,which could get the results more realistic and credible.
出处
《东北水利水电》
2018年第8期53-56,共4页
Water Resources & Hydropower of Northeast China
关键词
壅水坝
工程库区
浸没分析
backwater dam
project reservoir
immersion analysis