3JAAFARI A. , MANIVONG K. Synthesis of a model for life-cycle project management[J]. Computer-Aided Civil and Infrastructure Engineering, 2000, 15: 16-68.
4MCGRAW-HILL CONSTRUCTION. Building information modeling: transforming design and construction to achieve greater industry productivity[R]. USA: McGraw-Hill Con- struction Press, 2010: 4-10.
5KOSKELA L. An exploration towards a production theory and its application to construction[M]. Finland: VTT Pub- lications, 2000: 45-49.
6HARVEY R. , BAHGAT T. , GERBE D. BIM as a risk management platform enabling integrated practice and de livery[M]. Manitoba: Matrix Group, 2009: 67-71.
7NOUR M. Performance of different (BIM/IFC) exchange formats within private collaborative workspace for collabo- rative work[J]. Journal of Information Technology in Con- struction, 2009, 14(S): 736-752.
8Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
9Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
10Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.