摘要
天铁集团电网曾经遭受多次雷击停电,影响了企业安全生产。为应对这一问题,金庄变电站采取了一些新措施,并组织了实施。实施投运至今,没有出现雷击停电事故,防雷效果良好。结合电网现状和雷击特点,介绍、分析了金庄变电站110 k V线路采取的防雷治理措施。
In recent years,the power grid system of Tiantie Group has been struck by lightning for many times,which led to power cuts and affected safe production.In order to deal with this problem,Jinzhuang transformer substation has taken some innovative measures,which has been effective in lightning protection and eliminated power cut caused by lightning.The paper introduces and analyzes the lightning protection measures of the 110 kV grid combining with current situation of the power grid and the characteristics of lightning strike.
作者
尹世谦
YIN Shiqian(Equipment and Power Department of Tiantie Group,Shexian,Hebei 056404,China)
出处
《冶金动力》
2018年第9期8-10,共3页
Metallurgical Power
关键词
110KV线路
防雷
措施
110 kV grid
lightning protection