综采工作面机电设备的安装与拆除工艺分析 被引量:5

Analysis on the Installation and Dismantling Process of Mechanical and Electrical Equipment in Fully Mechanized Face
下载PDF
导出
摘要 在煤矿生产作业中,经常需进行综采设备的安装与拆除作业。为使综采设备的安装与拆除作业更高效、更快捷,基于综采工作面机电设备安装与拆除现状,分析了机电设备的安装工艺与拆除工艺,提出了具体优化策略,并总结了安装与拆除作业中应注意的事项。 In the production of coal mine,the installation and dismantling of fully mechanized coal mining equipment is often needed.In order to make the installation and demolition work of fully mechanized mining equipment more efficient and fast,this paper analyzed fully mechanized working face of mechanical and electrical equipment installation and removal based on the situation of the installation and removal process of electromechanical equipment,put forward specific optimization strategy,and summarized the matters needing attention in the installation and demolition work.
作者 王雪龙 秦飞龙 WANG Xue-long;QIN Fei-long(Datong Coal Mine Group,Majiliang Mine,Datong 037000,China)
出处 《机电工程技术》 2018年第6期179-181,共3页 Mechanical & Electrical Engineering Technology
关键词 机电设备 安装工艺 拆除工艺 注意事项 mechanical and electrical equipment installation process dismantling process precautions
  • 相关文献

参考文献6

二级参考文献25

共引文献24

同被引文献18

引证文献5

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部