期刊文献+

水布垭面板堆石坝安全监测及分析 被引量:2

Safety monitoring and analysis of Shuibuya concrete faced rockfill dam
下载PDF
导出
摘要 通过对水布垭面板堆石坝已有的监测资料进行分析,探讨坝体在施工期和水库蓄水运行初期变形及应力的变化规律,对该面板堆石坝稳定性与安全性进行评价,为大坝今后安全运行提供依据。 Analysis was made on the monitoring data of Shuibuya concrete faced rockfill dam,based on which the author studied the change rule of dam body deformation and stress during the construction period and initial stage of reservoir impoundment and operation,evaluated the stability and safety of this rockfill dam,so as to provide basis for dam operation in the future.
作者 韩勇 HAN Yong(Guizhou Design Institute of Water Conservancy and Hydroelectric Power,Guiyang 550002,China)
出处 《广西水利水电》 2018年第4期74-77,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 水布垭 面板堆石坝 安全监测 分析 Shuibuya concrete faced rockfill dam safety monitoring analysis
  • 相关文献

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部