期刊文献+

合肥高新区综合管廊典型节点设计探讨 被引量:2

Design Discussion on Typical Joints of Utility Tunnel in Hefei Hi-Tech Area
下载PDF
导出
摘要 合肥高新区综合管廊一期工程共7条管廊,除雨水不入廊外,其余市政管线全部入廊。管线种类及规格众多,7条管廊沿7条道路分布且相互交叉,存在着各种特殊节点设计。针对设计过程中的几个典型节点作探讨、分析,为类似工程提供借鉴和参考。 In the first phase of utility tunnel project of Hefei Hi-Tech Area,there are 7 utility tunnels.Except for the rainwater no-entering the tunnel,the other municipal pipelines are all in the tunnel.There are many types&specifications of pipelines.7 utility tunnels are distributed along 7 roads and intersecting with each other.There are various special node designs in the project.A few typical nodes during the design process are discussed&analyzed,which may provide references for similar projects.
作者 严中 毛峰 Yan Zhong;Mao Feng(Hefei Municipal Design Research Institute Co.,Ltd.,Hefei 230041,China;Shanghai Urban Construction Design&Research InstituteCo.,Ltd.,Shanghai 200125,China)
出处 《中国市政工程》 2018年第4期56-59,63,110,共6页 China Municipal Engineering
关键词 综合管廊 节点设计 污水 联络通道 T形节点 utility tunnel node design wastewater connecting channel T-shaped node
  • 相关文献

同被引文献19

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部