4Zwebek A I,Pilidis P.Degradation effects on combined cycle power plant performance part 3:gas and steam turbine degradation effects[C]//Proceedings of the ASME Turbo Expo.Amsterdam,Netherlands:ASME,2002:763-770.
5Mund F C,Pilidis P.Gas turbine compressor washing:historical developments,trends and main design parameters for online systems[J].Journal of Engineering for Gas Turbines and Power,2006,128(2):344-353.
6Litinetsky A,Litinetski V,Hain Y,et al.Parametric study of on-line compressor washing systems using CFD analysis[C]//Proceedings of the ASME Turbo Expo.Berlin,Germany:ASME,2008:903-912.
7Stephen D H.Strategy for selecting optimized technologies for gas turbine air inlet filtration systems [C]//Proceedings of the ASME Turbo Expo.Vancouver,Canada:ASME,2011:559-568.
8Wilcox M.Successful selection and operation of gas turbine inlet filtration systems[C]//Proceedings of the Fortieth Turbomachinery Symposium.Houston,America,2011:254-268.
9Dorschel M.Re-engineering of an inlet air filtration system for a 100mw combined cycle cogeneration power plant[C]//Proceedings of the ASME 2011 Power Conference.Colorado,America,2011:1-11.
10Brekke O.Performance deterioration of intake air filters for gas turbines in offshore installations[C]// Proceedings of the ASME Turbo Expo.,Glasgow,UK:2010:685-694.