4US NRC. Title 10, code of Federal Regulations, Appendix A to part 50 - general design criteria for nuclear power plant[ R].
5US NRC. Evaluating the habitability of a nuclear power plant control room during a postulated hazardous chemical release [ S ]. Regulatory Guide 1.78. Revision 1. 2002.
6US NRC. Protection of nuclear power plant control room operators against an accidental chlorine release [ S]. Regulatory Guide 1.95. Revision 1. 1977.
7US NRC. Demonstrating control room envelope integrity at nuclear power reactors [ S ]. Regulatory Guide 1. 197. 2003.
8US NRC. Control room habitability at light - water nuclear power reactors [ S]. Regulatory Guide 1. 196. 2003.
9Nuclear Energy Institute. Control room habitability assessment guidance [R]. NEI 99-03. Revision 0. 2001.
10American Society for Testing and Materials. Standard test method for determining air change in a single zone by means of a tracer gas dilution [S]. ASTM E741-00. 2006.