期刊文献+

武山铜矿主井提升机首绳更换工艺改进 被引量:1

Improvement of Head Rope Replacement Process for Main Shaft Hoist in Wushan Copper Mine
下载PDF
导出
摘要 武山铜矿主井提升机原首绳更换方式存在工艺复杂、作业时间长、劳动强度大等诸多问题,经多次分析总结以往换绳方法,由原"二四"法改进为一次性同步更换6根首绳,有效地提高多绳摩擦式提升机首绳的更换效率,并降低了作业人员的劳动强度。 The replacement style of hoist rope in Wushan Copper Mine has lots of problems including complicated process,long working time and high labor intensity.Afteranalyzing the previous methods of changing the rope,the original"2+4"methods is changed into the6 ropes replacement in one-time.The efficiency of the replacement of multi-rope friction hoist rope is improved effectively,and the labor intensity of workers is reduced.
作者 邝志华 李华政 KUANG Zhi-hua;LI Hua-zheng(Wushan Copper Mine,Jiangxi Copper Corporation,Ruichang 332204,Jiangxi,China)
出处 《铜业工程》 CAS 2018年第4期102-108,共7页 Copper Engineering
关键词 多绳摩擦式提升机 首绳 同步更换 效率提升 工艺改进 multi-ropefriction hoist head rope synchronous replacement efficiency improvement process improvement
  • 相关文献

参考文献5

二级参考文献4

  • 1祁雪来.多绳摩擦提升机快速换绳方法[J].煤矿机电,2007,28(3):76-77. 被引量:15
  • 2嘉佩.材料力学[M].北京:高等教育出版社,1982..
  • 3振戍.五金手册[M].北京:机械工业出版社,2001..
  • 4臧文周.矿山机械[M].北京:高等教育出版社,1982..

共引文献9

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部