摘要
以某房地产项目室外基础设施配套工程为对象,对基于Max-npv的支付进度安排问题进行了研究。首先介绍了工程背景资料;其次构建了资金约束下的Max-npv调度问题优化模型,并求解获得满意支付进度安排;最后对理论求解结果与实际情况进行对比分析,项目净现值提升幅度为17.8%,项目最大化资金缺口得到改善。研究为项目支付进度管理定量化决策提供了依据。
Taking a real estate outside infrastructure project as background,the payment scheduling problem based on the max-npv is studied.The project is presented at first.And then the optimization model of Max-npv scheduling problem is constructed under the constraint of capital,and the satisfactory payment schedule based on the dynamic equilibrium of cash flow is obtained.Finally,the optimal solution is compared with the actual implementation of the project,the net present value of the project is improved by 17.8%,and the maximum funding gap is improved.The study provides a basis for the quantitative decision making of project payment schedule management.
作者
晋艳
何正文
JIN Yan;HE Zhengwen(School of Urban Construction,Xi’an Siyuan University,Xi’an 710038,China;School of Management,Xi’an Jiaotong University,Xi’an 710049,China)
出处
《工业工程》
北大核心
2018年第4期43-50,61,共9页
Industrial Engineering Journal
基金
国家自然科学基金资助项目(71371150/G010301)
陕西省教育厅2015专项科研计划资助(15JK2100)
关键词
支付进度安排
室外配套工程
优化模型
project payment scheduling
outdoor supporting project
optimization model