摘要
论文结合太原站站内三处地道接长施工,对地道接长施工过程中部分施工环节进行了方案优化,并采取必要的质量控制措施,从而使太原站内三处地道接长顺利完工。
Combined with the three tunnel extension construction inner the Taiyuan station,the scheme optimization is carried out for some construction links in tunnel extension construction,and necessary quality control measures are taken,as a result,the three tunnel extension constructioninner theTaiyuanstationare completedsmoothly.
作者
王文海
WANG Wen-hai(Taiyuan District Engineering Construction Headquarters,Daqin Railway Limited by Share Led,Taiyuan 030013,China)
出处
《中小企业管理与科技》
2018年第25期15-16,共2页
Management & Technology of SME
关键词
既有线
站内
地道接长
方案优化
质量控制
existingline
instation
tunnel extension
schemeoptimization
qualitycontrol