1Russell J, Philip H. Cost effective well abandonment [J] . SPE 30349, 1995.
2Evans B L, Sailor R P. Well abandonment in the Los Angeles Basin. a Summary of current requirements, practices and problems [J].SPE38337, 1997.
3James W, Suliman S, AI-Suwailem R, et al. A unique rigless casing leak repair, Ghawar Field, Saudi Arabia [J] . SPE68129, 2001.
4Folorunso A, Rodger L, Robert A. Rigtess installation of safety valves to implement a well--integrity campaign and return wells to production[J] . SPE106533, 2007.
5Zacarisa G, l.uis H D, Jose V C. Efficient offshore scale removal without a rig: planning, logistics, and execution [J] . SPE113783, 2008.
6David H, Paul G. New offshore rigless intervention system [J] . SPE104747, 2007.
7Dick A J. Deepwater subsea well intervention--the future solution [J] , SPE93866, 2005.
8Siri N, Robert F, Bernt G. Present and future well intervention on subsea wells [J] . SPE112661, 2008.
9Eamonn M, Coflexip S. Subsea well intervention from a monohull vessel [J] . SPE30424, 1995.
10Willis S K, Campbell J A S. The development of a light well intervention ship [J]. SPE60729, 2000.