摘要 为预测并控制航道大面积开挖对下方已建地铁结构变形的影响,以京杭运河浙江段Ⅲ级航道整治杭州段(新开挖航道)跨地铁1号线节点工程为例,分别研究正常开挖和采用一定措施时地铁盾构隆起位移的理论值。结合工程的地质条件和地铁安全运营要求,提出分块挖土条、坑内满堂加固和抗拔门架结构等多种抗隆起措施,并利用三维有限元分析软件对河道开挖全过程进行施工阶段数值模拟。结果表明,该措施对控制地铁位移是有效的,能够满足地铁安全运行的要求。 In order to forecast and control the deformation of existing underground tunnels induced by canal excavation,based on a metro-crossing canal excavation example of Zhejiang section of the Beijing-Hangzhou Canal in Hangzhou,we study the theoretical deformation values of the tunnel structure under both common excavation scheme and the scheme with certain heave resistance measures.A series of construction measures are attempted,including block excavation,foundation reinforcement and uplift frame structure to resist the shift of underlying metro line 1,based on all the geological conditions and design requirements that have been known.Moreover,a 3D finite element model is established to simulate the whole excavation process,and the results prove that the measures designed for controlling the deformation of subway shields are effective and can fulfill the requirements of safety operation of metro tunnel.
作者 盛军其 李佳玮 金彬彬 徐朝辉 SHENG Jun-qi;LI Jia-wei;JIN Bin-bin;XU Chao-hui(Hangzhou Communications Investment Group Co.,Ltd.,Hangzhou 310024,China;Zhejiang Provincial Institute of Communications Planning,Design&Research,Hangzhou 310006,China)
出处 《水运工程》 北大核心 2018年第9期151-155,160,共6页 Port & Waterway Engineering
关键词 航道工程 基坑工程 数值分析 地铁隧道 waterway engineering foundation engineering numerical analysis metro tunnel
  • 相关文献

参考文献3

二级参考文献3

共引文献318

同被引文献40

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部