摘要
滨海电厂软土场地特有的岩土工程问题常常给工程建设带来许多困难和风险,需要妥善处理和应对。通过越南沿海电厂岩土工程问题的分析,给出了成功的解决方案,也论述失败的教训,可供滨海电厂工程借鉴。
In soft soil site of coastal power plants,there are special geotechnical problems bring the construction with great difficulty and risks.It must be handled and solved properly.In this paper,Geotechnical Problems of Duyen Hai Power Plant in Vietnam have been analyzed with successful solutions.Lessons of failure about the problems also been discussed for reference to other coastal power plants.
作者
王清黎
WANG Qing-li(China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Guangzhou 510663,China)
出处
《电力勘测设计》
2018年第7期31-35,共5页
Electric Power Survey & Design
关键词
滨海电厂
软土场地
岩土工程问题
coastal power plants
soft soil site
discharge culvert
geotechnical problem