高速公路PPP项目融资困境及建议研究 被引量:9

Research on the Difficulties and Suggestions for Expressway PPP Project Financing
下载PDF
导出
摘要 根据高速公路PPP项目的融资现状,对其项目的融资特点、风险和股本结构进行分析,得出当前高速公路PPP项目融资面临的难题,分别为多方参与的合同谈判难以控制、项目自身存在复杂多变的风险、项目资本金筹集的严格要求,并从融资主体、合同谈判、风险分担三个方面提出相应的解决方法,以实现我国高速公路PPP项目融资健康发展达到理想模式。 According to the financing status of expressway PPP projects,this paper analyzes the financing characteristics,risks and capital structure of PPP projects,finds many difficulties of the current expressway PPP project financing,including the difficulty to control the multi participation contract negotiation,the complex and changeable risk of the project itself and the strict requirement of the project capital collection.Then,puts forward the corresponding solutions from three aspects of financing subject,contract negotiation and risk sharing,hopes to help the China’s expressway PPP project financing develop healthily and achieve the ideal model.
作者 李蒙 刘玲霞 LI Meng;LIU Lingxia(Evergrande School of Management,Wuhan University of Science and Technology,Wuhan 430081,China)
出处 《建筑经济》 北大核心 2018年第10期50-54,共5页 Construction Economy
基金 国家自然科学基金项目(71701155) 服务科学与工程研究中心开放基金(CSSE2017GB15)
关键词 高速公路 PPP项目 项目融资 资本结构 expressway PPP project project financing capital structure
  • 相关文献

参考文献2

二级参考文献24

  • 1Cruz,C.O.,Marques,R.C.Using the economic and financial equilibrium model to decrease infrastructure contract incompleteness[J].Journal of Infrastructure Systems,2013(19):58-66.
  • 2Guasch J.L.Granting and Renegotiation Infrastructure Concessions:Doing it Right[R].World Bank Institute(WBI)Development Studies,Washington,DC.2004.
  • 3Cruz,C.O.,Marques,R.C.Exogenous determinants for renegotiating public infrastructure concessions:evidence from Portugal.Journal of construction engineering and management,2013(139):1082-1090.
  • 4Engel,E.,Fischer,R.,Galetovic,R.Soft budgets and renegotiations in Public-Private Partnerships[R],Cowles Foundation discussion paper NO.1723,Yale Univ.,New Haven,CT.August 2009.
  • 5Engel E.,Fischer R.,Galetovic R.Public-Private Partnerships to Revamp U.S.InfrastructurefR].Hamilton Project Report,2011:1-26.
  • 6Cruz,C.O.,Marques,R.C,Cardoso P.Empirical evidence for renegotiation of PPP contracts in the road sector[J].Journal of Legal Affairs&Dispute Resolution in Engineering&Construction^14:1943-4170.
  • 7Cruz,C.O.,Marques,R.C.Endogenous determinants of concession renegotiation:evidence from local infrastructure[J],Local Government Studies,2013,39(3):352-374.
  • 8Bitran,E.,Nieto-Parra,S.,Bobledo,J.S.Opening the black box of contract renegotiations:an analysis of road concessions in Chile,Colombia and Peru[R],OECD development Centre,working paper,2013(4):317.
  • 9Guasch J.L,Jean-Jacques Laffont,Straub.S.Concessions of infrastructure in Latin America government-led renegotiation[J].Journal of Applied Econometrics,2007(22):1267-1294.
  • 10Julie De Brux.The dark and bright sides of renegotiation:an application to transport concession contracts[J],Utilities Policy,2010(18):77-85.

共引文献13

同被引文献49

引证文献9

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部