摘要
根据巴里坤至哈密公路东天山隧道工程地质勘察成果,介绍了隧址区地形地貌、地层岩性、地质构造及水文地质条件。着重分析了几个主要工程地质问题,并提出了相应的处理措施。
Based on the geological investigation results of East Tianshan Mountain Tunnel of Balikun-Hami Road,this paper introduces the topography and landform,formation lithology,geological structure and hydrogeology conditions at tunnel site.Furthermore,it has highlighted several major engineering geological problems and proposed corresponding treatment measures so as to provide reference for tunnel design and construction.
作者
闫冬飞
潘智锋
谢国卫
YAN Dongfei;PAN Zhifeng;XIE Guowei(CCCC Highway Consultants Co.,Ltd.,Beijing 100088,China)
出处
《路基工程》
2018年第A01期91-95,共5页
Subgrade Engineering
关键词
东天山
公路隧道
地质勘察
工程地质问题
工程措施
East Tianshan Mountain
highway tunnel
geological investigation
engineering geological problems
engineering measures