摘要
目前,城市轨道交通车辆基地上盖物业开发存在诸多问题。针对消防、结构及预留接口设计进行了分析,提出了设计理念及方法。对开发模式进行了概念性阐述,指出消防设计可参考的设计思路,总结结构设计中设计要点,提出上盖物业不同步开发时的部分预留措施,为后续城市轨道交通上盖物业开发的设计提供参考。
At present,many critical issues exist in the upper cover property development of rail transit vehicle base.In this paper,some design ideas and methods are proposed based on an analysis of fire protection,structure and reserved interface design,the concept of development model is introduced,some reference design ideas for fire control are proposed,key points in the structure design are summarized.On this basis,reserved measures for the asynchronous development of upper cover property are put forward,in order to provide references for the design of subsequent upper cover property development in urban rail transit.
作者
穆亮
杨光
MU Liang;YANG Guang(Shandong Institute of Architectural Design Ltd.of China Railway First Design Institute Group,264200,Weihai,China)
出处
《城市轨道交通研究》
北大核心
2018年第10期151-155,共5页
Urban Mass Transit
关键词
城市轨道交通
车辆基地
上盖物业开发
消防
结构
预留接口
urban rail transit
vehicle base
upper cover property development
fire protection
structure
reserved interface