矿井沿空掘巷巷旁爆破切顶卸压研究 被引量:4

Research on Pressure Relief of Roof with Blasting and Cutting in Gob Side Entry Driving Roadway
下载PDF
导出
摘要 为了解决9煤层坚硬顶板垮塌对1902N工作面回风巷的影响,提出采用沿顺槽布置爆破孔,强制放顶的方式进行顶板管理。对深孔爆破参数孔深、装药量、孔距和合理阻塞长度等进行确定,并对强制放顶效果进行分析。结果表明:与未切顶段巷道相比,巷道顶底板移近量40 mm,减少68. 9%,两帮移近量55 mm,减少58. 6%,没有出现巷帮整体向巷道内空间移动的情况。 In order to avoid the influence of the hard roof collapse in No.9 coal seam on the return airway of 1902N working face,it is proposed to adopt the way of blasting holes along the air way and forced collapse to manage the roof.The hole depth,charge amount,hole spacing and reasonable block length of deep hole blasting parameters were determined,and the effect of forced collapse was analyzed.The results show that,compared with the uncut section roadway,the displacement of the roof and floor of the roadway is 40 mm,which is reduced by 68.9%,and the displacement of the two walls of the roadway is 55 mm,which is reduced by 58.6%.There is no movement of the roadways as a whole.
作者 李铁良 LI Tieliang
出处 《山西焦煤科技》 2018年第8期39-43,共5页 Shanxi Coking Coal Science & Technology
关键词 沿空掘巷 坚硬顶板 强制放顶 围岩位移 Gob side entry driving Hard roof Forced roof cutting Displacement of surrounding rock
  • 相关文献

参考文献2

二级参考文献4

共引文献15

同被引文献22

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部