论EPC总承包长输油气管道工程交工验收不符合项整改管理 被引量:1

Management of Rectifying Non-conformance Terms in the Handover and Acceptance of Long-distance Oil and Gas Pipeline Project for EPC
下载PDF
导出
摘要 国内油气管道建设实行建管分离以来,工程项目交工验收不符合项整改工作不可避免,其整改内容、整改数量、整改质量花费了总承包商或分包商大量的人力、物力和精力,已成为项目管理的难点之一。从EPC(engineering,procurement,construction)总承包商的角度出发,介绍如何做好不符合项的整改管理工作,实现工程项目进度、质量、安全的管理目标,为今后工程项目管理提供借鉴。 Since the oil and gas pipeline construction and operation were separated in China,it was unavoidable to rectify non-conformance term in the handover and acceptance of a project.The content,quantity,quality of rectification have taken EPC or subcontractors a great deal of manpower,material resources and days.It has become one of the difficulties in project management.From the point of view of EPC,this paper introduces how to do well in the management of rectifying non-conformance terms,so as to achieve the management objective of the project progress,quality and safety,and provide reference for the project management in the future.
作者 李进 王永军 崔进杰 杨帆 李灏 Jin Li;Yongjun Wang;Jinjie Cui;Fan Yang;Hao Li(Southeast Asia Division of China Petroleum Pipeline Engineering Co.Ltd.,Langfang Hebei;No.4 Branch Company of China Petroleum Pipeline Engineering Co.Ltd.,Langfang Hebei;The Domestic Business Division of China Petroleum Pipeline Engineering Co.Ltd.,Langfang Hebei)
出处 《石油天然气学报》 CAS 2018年第3期120-125,共6页 Journal of Oil and Gas Technology
关键词 EPC总承包 管道工程 不符合项整改 EPC Pipeline Project Rectifying Non-conformance Term