翻身吊装设计中的吊环载荷分析 被引量:3

Analysis of the Load on Lifting Ring in Turning Process Plan Design
下载PDF
导出
摘要 针对船体分段翻身吊装设计中吊环载荷计算的合理性问题,建立翻身吊装过程的参数化模型,推导吊环载荷函数,分析吊环载荷的变化规律,结果表明,重心、吊环、折点之间位置关系决定着吊环载荷的变化,分别以不同形式截面的船体分段或总段为例进行验证,确认模型和分析方法可行,给出吊装操作建议。 In view of the reasonableness of the original calculation method of the load on lifting ring in the hull block turning process,the parameterized model of the turning process was set up.The function of the load on the lifting ring was analyzed.The variation law of the load on the ring was studied.The results showed that the position relationship between the center of gravity,the rings and the break points determines the change trend of the load of the rings.Taking the hull blocks with different shape of sections as examples,the calculation model and method were verified to be practicable for design of turning process.
作者 钱振华 夏勇峰 罗金 QIAN Zhen-hua;XIA Yong-feng;LUO Jin(School of Naval Architecture,Ocean&Civil Engineering,Shanghai Jiao Tong University,Shanghai 200030,China;Shanghai Jiangnan Changxin Shipbuilding Co.,Ltd.,Shanghai 201913,China;Hudong Zhonghua Shipbuilding(Group)Co.,Ltd.,Shanghai 201913,China)
出处 《船海工程》 北大核心 2018年第5期1-5,共5页 Ship & Ocean Engineering
基金 工信部项目(工信部联装函[2016]545号)
关键词 翻身吊装 上升吊环 下降吊环 折点 吊环载荷 turning process rising lifting ring dropping lifting ring break point load of lifting ring
  • 相关文献

参考文献5

二级参考文献26

  • 1徐升,张吉萍.大型船舶上层建筑整体吊装技术[J].中国水运(下半月),2010,10(12):147-148. 被引量:2
  • 2肖文勇.潜艇分段板式吊耳强度校核[J].船海工程,2007,36(5):38-40. 被引量:8
  • 3龙凯,贾长治,李宝峰.Patran2010与Nastran2010有限元分析从入门到精通[M].北京:机械工业出版社,2011.
  • 4纪卓尚.船体分段吊装参数的确定[J].中国造船,1984(2):86-94.
  • 5薛云,张延昌,王自力,等.船舶分段吊装吊耳强度分析[C]//第四届全国船舶与海洋工程学术会议论文集,2009:181.
  • 6LI Rui, LIU Yujun, WANG Ji. Research on the intelligent de- sign method of block lifting in shipbuilding[ C ]/ /Proceedings of International Conference on Computer Applications in Ship building. London, UK:RINA, 2013, 2:183-188.
  • 7LEE J K, LEE K J, PARK H K. Developing scheduling sys- tems for Daewoo shipbuilding: DAS project E J J. European Journal of Operational Research, 1997, 97(2) : 380-395.
  • 8KIM H, LEE S S. A model for a simulation-based shipbuild- ing system in a shipyard manufacturing process[J]. Interna- tional Journal of Computer Integrated Manufacturing. 2005, 18 (6) :427-441.
  • 9MIURA Y. Development of "block lifting simulation system" with ship 3D-CAD model EC://Proeeedings of InternationalConference on Computer Applications in Shipbuilding. London, UK:RINA,2011, 1:151-155.
  • 10SOH A K, SOH C K. Design and analysis of offshore lifting padeyes[J]. Journal of Constructional Steel Research, 1989, 14(3) : 167-180.

共引文献24

同被引文献15

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部