南海浮托安装纵荡限位装置设计 被引量:1

Design of Surge Stopper for Floatover Installation in South China Sea
下载PDF
导出
摘要 针对南海浮托安装就位难题,设计新型浮托安装纵荡限位装置(纵荡挡板),该装置安装于导管架进船侧桩腿上部,实现组块浮托安装快速就位,保持组块对接过程中组块对接装置插尖位置的稳定。与以往同类项目就位方式相比,采用纵荡挡板限位可以缩短浮托安装就位时间,提高安装船舶限位能力,提升整体浮托安装效率,并显著降低作业风险。 Aiming at the difficulty of floatover alignment operation in South China Sea,a new type of surge restriction device called surge stopper was designed.The device is installed in the upper part of the jacket legs from the docking side,which can help the barge reach in alignment position quickly,and is helpful to maintain LMU matting pins’position in matting operation.This device has sufficient strength to resist the collision force generated by the lateral movement of the installation barge.Compared with the previous alignment method,using surge stopper will shorten the alignment time,improve the floatover installation capacity and efficiency,reduce the installation risk,and surge stopper can be promoted in the follow-up similar projects.
作者 毛程亮 梁瑜 穆怡 MAO Cheng-liang;LIANG Yu;MU Yi(Offshore Oil Engineering Co.,Ltd.,Tianjin 300451,China)
出处 《船海工程》 北大核心 2018年第5期129-132,137,共5页 Ship & Ocean Engineering
关键词 浮托安装 纵荡限位 纵荡挡板 深水导管架 floatover installation surge restriction surge stopper deep-water jacket
  • 相关文献

参考文献5

二级参考文献29

  • 1刘东玉,郭刚,徐兴平.海洋平台浮装就位技术研究[J].中国海洋平台,2004,19(6):50-53. 被引量:7
  • 2房晓明,郝军,魏行超.南堡35-2油田中心平台应用浮托法安装新工艺实践[J].中国海上油气(工程),2006,18(2):126-129. 被引量:24
  • 3徐田甜,董坤,王宁.渤中34-1油田CEPA中心平台生活模块结构设计[J].船舶,2007,18(3):40-45. 被引量:3
  • 4DNV, Rules for Planning and Execution of Marine Operations[ S]. 1996.
  • 5Noble Denton, General Guidelines for Marine Transportations, No: 0030/NDI[ S].
  • 6Noble Denton, Guidelines for Loadouts, No :0013/NDI[ S].
  • 7ONeill L A,Fakas E,RonaldsBF.History,trends and cvolution of float over deck installation in open waters[C].// SPE Annual Technical Conference and Exhibition,SPE 63037,Texas:Dallas,2000,1-4.
  • 8Michel Seij,Henk de Groot.State of the art in float-overs,19072 MS offshore technology conference[C].Texas:Houston,2007,30.
  • 9Wang Alan M,Jiang Xizbao,Yu Changsheng.Latest progress in floatover tcchnologies for offshore installation and decommission ing[C].China:Proceedings of the Twentieth (2010) International Offshore and Polar Engineering Conference,2010.
  • 10Jong-Jin Jung,Woo-Seob Lee.Evaluating the impact load on the offshore platform during float-over topside installation[C].//Proceedings of the Nineteenth (2009) lntenational Offshore and Polar Engineering Conference,Japan:Osaka,2009,205-210.

共引文献60

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部