BIM技术驱动的工程项目管控机制创新 被引量:1

BIM technology-driven engineering oroject management and control mechanism innovation
下载PDF
导出
摘要 随着BIM技术在工程项目的应用日益增多,BIM的基础理论研究主题不断丰富,文章针对BIM技术应用在我国传统建筑业时出现的"BIM双轨制"现象,以BIM咨询项目为数据来源,采用扎根理论,遵循"数据收集与整理,开放式编码、主轴编码、选择性编码,理论构建和形成"流程,对原始资料进行编码处理。通过对"故事线"逻辑脉络的分析,创新以"BIM技术驱动的工程项目管控"为最终核心范畴,行为规范、监查纠偏、决策支持和信息集成与反馈为四个副核心范畴的BIM技术驱动的工程项目管控机制新模型,以改善BIM技术与传统工程项目管理流程产生"低效率耦合"问题,提高工程项目管理绩效。 Basic theory research themes of BIM is enriched constantly as more and more application of BIM technology in engineering projects.BIM consulting project is regarded as data source,grounded theory is adopted,the flow of‘data collection and sorting,open coding,axial coding,selective coding,theory construction and formation’is followed for encoding original data in view of‘BIM double-track system’phenomena during application of BIM technology in China traditional construction industry.BIM technology-driven engineering project management and control mechanism innovation model is innovated through analyzing‘story line’logical vein,wherein‘BIM technology-driven engineering project management and control’is regarded as the final core category,conduct regulation,monitoring action,decision support as well as information integration and feedback are regarded as four deputy core categories,thereby improving‘low efficiency coupling’problem in BIM technology and traditional engineering project management flow,and improving engineering project management performance.
作者 赖铭华 Lai Minghua(Guangdong Yongdao Engineering Consulting Co.,Ltd.,Guangzhou 510610,China)
出处 《工程造价管理》 2018年第5期73-78,共6页 Engineering Cost Management
关键词 BIM技术 扎根理论 管控机制创新 BIM technology Rooted theory Control mechanism innovation
  • 相关文献

参考文献3

二级参考文献41

  • 1谢识予.经济博弈论(第三版)[M].上海:复旦大学出版社,2006.179-182.
  • 2Lampel J, Shamsie J. Capabilities in Motion: New Organizational Forms and the Reshaping of the Hollywood Movie Industry [ J ]. Journal of Management Studies, 2003, 40(8) : 2189 -2210.
  • 3Ahuja G. Collaboration Networks, Structural Holes, and Innovation : A Longitudinal Study [ J]. Administrative Science Quarterly, 2000, 45 (3) : 425 - 455.
  • 4Smyth H. Construction Industry Performance Improvement Programmes : The UK Case of Demonstration Projects in the Continuous Improvement" Programme [ J]. Construction Management and Economics, 2010, 28(3): 255-270.
  • 5Adriaanse A, Voordijk H, Dewulf G. The Use of Interorganisational ICT in Construction Projects [ J ]. Journal of Construction Engineering and Management. 2010, 136(9) : 1003-1014.
  • 6Winch G M. Zephyrs of Creative Destruction: Understanding the Management of Innovation in Construction [ J]. Building Research and Information, 1998, 26(4), 268-279.
  • 7Tucker R L. Perfection of the Buggy Whip [ J ]. Journal of Construction Engineering and Management, 1988, 114(2): 157- 171.
  • 8Froese T M. The Impact of Emerging Information Technology on Project Management for Construction [ J]. Automation in Construction, 2010, 19(5) : 531 -538.
  • 9Young N W, Jones S A, Bernstein H M. Building Information Mod- eling: Transforming Design and Construction to Achieve Greater Industry Productivity [ R]. New York : McGraw - Hill Construction, 2008.
  • 10Taylor J E, Bernstein P. Paradigm Trajectories of Building Information Modeling Practice in Project Networks [ J]. Journal of Management in Engineering, 2009, 25 (2) : 69 - 76.

共引文献44

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部