期刊文献+

基于DEA模型的高速公路BOT项目特许经营者选择研究 被引量:1

Study on the Concessionaire Selection of Highway BOT Projects Based on DEA Model
下载PDF
导出
摘要 BOT模式已广泛应用于我国高速公路项目的建设与运营,选择理想的特许经营者是项目获得成功的关键因素之一,采用合适的特许经营者选择方法非常重要。DEA模型对高速公路BOT项目的特许经营者选择有很大的适用性,但其使用受到指标与决策单元数量关系的限制。为打破这种限制,可在原始DEA模型的基础上引入代表政府期望的虚拟最优决策单元来建立高速公路特许经营者选择评价模型。算例分析验证了该模型的可行性,灵敏度检验结果及其Spearman相关性检验结果表明了该模型结果的稳定性。 The BOT model has been widely used in the construction and operation of highway projects in China.Choosing an ideal concessionaire is one of the key factors in the success of the projects.Therefore,it is crucial to adopt an appropriate concessionaire-selection method.The DEA model has great applicability to the selection of concessionaire for highway BOT projects,but its use is limited by the number relations of indicators and decision-making units.To break this limitation,a virtual optimal decision-making unit that represents the government s expectation can be introduced on the basis of the original DEA model to establish the highway concessionaire selection model.An example is given to verify the feasibility of the model,and the results of sensitivity test and Spearman correlation test show the stability of the model.
作者 宋丽锋 许静 孙钰 SONG Lifeng;XU Jing;SUN Yu(School of Public Management,Tianjin University of Commerce,Tianjin 300134,China;School of Management and Economics,Tianjin University,Tianjin 300072,China)
出处 《北京城市学院学报》 2018年第5期53-59,共7页 Journal of Beijing City University
基金 国家自然科学基金资助项目:城市公共基础设施利用效益研究(NSF71273186)
关键词 高速公路 特许经营者 DEA 虚拟决策单元 highway concessionaire DEA virtual DMU
  • 相关文献

参考文献1

二级参考文献13

  • 1廖媛红,宋维强.建设项目的社会成本研究[J].中国人口·资源与环境,2006,16(4):23-27. 被引量:12
  • 2Holt G. Contractor selection innovation: examination of two decades' published research[J] . Construction Innovation: Information, Process, Management, 2010, 10 (3): 304-328.
  • 3Gilchrist A, Allouche E N. Quantification of social costs associated with construction projects: state-of-the-art review[J]. Tunnelling and underground space technology, 2005, 20 ( 1 ): 89-104.
  • 4Wang, X. Q., Liu, B. S., Allouche, E. N., and Liu, X. Y. A practical hid evaluation method considering social costs in urban infrastructure projects. Proceedings of the 2008 IEEE ICMIT.
  • 5Michel K, Gray R D, Irwin T, et al. Concessions for Infrastructure: A Guide to Their Design and Award [J]. World Bank technical papers, 1998 ( 399 ).
  • 6Dias Jr A, loannou P G. Company and project evaluation model for privately promoted infrastructure projects[J]. Journal of Construction Engineering and Management, 1996, 122 (1): 71-82.
  • 7Ahadzi M, Bowles G. Public-private partnerships and contract negotiations: an empirical study[J]. Construction Management and economics, 2004, 22 (9): 967-978.
  • 8Zhang X Q, Kumaraswamy M M. Hung Kong experience in managing BOT projects[J]. Journal of Construction Engineering and Management, 2001, 127 ( 2 ): 154-162.
  • 9Zhang X Q, Kumaraswamy M M, Zheng W, et al. Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong[J]. Journal of Construction Engineering and Management, 2002, 128 ( 2 ): 155-163.
  • 10Zhang X Q. Concessionaire selection: methods and criteria[J]. Journal of construction engineering and management, 2004, 130 (2): 235-244.

共引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部