依托天津地铁6号线工程实例,对工程筹划思路、指标进行了分析,并与实际施工工期进行了对比分析,给出了工程筹划建议及注意事项,可供类似工程借鉴。
Based on the engineering case of the No.6 Line in Tianjin,the paper analyzes the planning ideas and indexes for the projects,undertakes the comparative analysis with the actual construction period,and provides the engineering planning suggestions and precautions,so as to provide some similar reference for projects.