摘要 针对含限流电感的多端直流电网,提出了一种考虑高阻故障的快速保护方案。该方案以线路附加电感前端的电压变化率作为主判据,并增加了基于小波高频能量的高阻故障辅助判据。辅助判据通过平稳小波变换提取时窗内初始故障波和反射波的高频特征量,从而有效地提高保护在高阻故障下的灵敏度。保护方案的主判据和辅助判据在动作速度和耐受过渡电阻能力方面形成互补,且仅由本地量构成,无通信延时,能够满足多端直流电网对保护速动性和可靠性要求。最后,基于PSCAD/EMTDC搭建四端直流电网,仿真结果证明了本文所提方法的有效性。 A fast protection scheme considering high-resistance fault is proposed for multi-terminal DC grid with current limiting inductance.The rate of change of voltage measured at the front-end of current limiting inductance is used as the main protection criterion in the new algorithm,and an auxiliary criterion,which uses the wavelet-based high frequency energy,is added to improve the performance of protection under high resistance faults.The auxiliary criterion extracts the high-frequency characteristics of the initial and reflected traveling waves by using stationary wavelet transform(SWT),and can improve the sensitivity of the protection significantly under high resistance faults.The main and auxiliary criterion of the protection scheme complement each other in terms of speed and tolerance to fault resistance.In addition,the protection scheme only utilizes the local signals,and thus has no signal communication delay,which can satisfy the requirement of protection speed of multi-terminal DC grid.At last,a four-terminal DC grid is modeled based on PSCAD/EMTDC simulation platform,and substantial simulation results verify the effectiveness of the proposed method.
作者 李岩 龚雁峰 LI Yan;GONG Yanfeng(State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources,North China Electric Power University, Beijing 102206,China)
出处 《南方电网技术》 北大核心 2018年第6期16-22,共7页 Southern Power System Technology
基金 中央高校基本科研业务费专项资助(2017XS014)~~
关键词 多端直流电网 行波 高阻故障 电压变化率 小波高频能量 multi-terminal DC grid traveling waves high-resistance fault rate of change of voltage wavelet-based high-frequency energy
  • 相关文献

参考文献9

二级参考文献168

  • 1高强,林烨,黄立超,罗伟.舟山多端柔性直流输电工程综述[J].电网与清洁能源,2015,31(2):33-38. 被引量:75
  • 2段建东,张保会,周艺,罗四倍,任晋峰,杭乃善,刁桂平.基于暂态量的超高压输电线路故障选相[J].中国电机工程学报,2006,26(3):1-6. 被引量:64
  • 3Naidoo D, ljumba N M. A protection system for long HVDC transmission lines[C]//IEEE PES Conf Expo Africa, Durban: IEEE, 2005: 150-155.
  • 4Naidoo D, Ijumba N M. HVDC line protection for the proposed future HVDC systems[C]//Proc Int ConfPower Syst Technol. POWERCON, Singapore, 2004: 1327-1332.
  • 5Chavez P P, Jaeger N A F measurement by the quadrature Delivery, 2003, 18(1): 14-19.
  • 6Rahmatian F. Accurate voltage method[J]. IEEE Trans on Power Kucuksari S, Karady G G. Development of electrical circuit model for an optical potential transformer[C]//1EEE Power Eng Soc Gen Meet. Pittsburgh, 2008: 1-5.
  • 7KucuksariS, KaradyGG. Experimental comparison ofconventional and optical VTs, and circuit model for optical VT[J]. IEEE Trans Power on Delivery, 2011, 26(3): 1571-1577.
  • 8Pathirana V, McLaren P G, Dirks E. Hardware and software implementation of a travelling wave based protection relay[C]//IEEE Power EngSocGenMeet. San Francisco: IEEE, 2005: 701-706.
  • 9Frantz G. Signal core: A short history of the digital signal processor[J]. IEEE Solid State Circ Mag, 2012, 4(2): 16-20.
  • 10Chen P, Xu B Y, Li J. A travelling wave based fault locating system for HVDC transmission lines[C]//Int Conf Power Syst Technol. POWERCON. Chongqing: IEEE, 2007: 1-4.

共引文献476

同被引文献74

引证文献5

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部